Jacksonville Electrician Logs
Date: January 29, 2021
Zip Code:
City:
Electrician Notes
Started prepping site and making form boards for new concrete pad we are pouring. Stubbing needed conduit in place. Poured concrete slab for new 22kal generator and dug in conduit for generator wiring to where ATS is going. Set generator in place with lull. Set concrete post and mounted ATS to post and tied pipes from generator, feeder j-box and hand hole location into ATS. Pulled wires to generator and terminated generator and ATS.