Jacksonville Electrician Logs
Log #043707
Date: May 17, 2021
Zip Code:
City:
Electrician Notes
Installed three GFI’s at water cooler. Installed four plates. Replaced one 4-square box. Took several plugs apart in seven rooms near plumbing. Ohm’d out from point to point to find exact electrical layout. Installed three GFI’s in the order they need to be to protect rooms with plumbing. No power, traced all line sides back to panel with toner. No wires above dropped ceiling. All lines were in wall, mostly covered up. Checked lights. Found no power to several lights and switches. Trace conduit to lighting contactor and beaker power going to coil from beaker. Found a master switch at opposite end of building that turns contactor on/off. Switches were off. Works great.